Roads and Traffic Authority, N S W text image
Gerringong to Bomaderry
Home > Gerringong to Bomaderry

Document Links

Documents can be downloaded by clicking on the links below:

Community updates
November 2009 (205 KB)
June 2009 (6.94MB)

March 2009 (96KB )
October 2008 (5.5MB)
June 2008 (138KB)
November 2007 (6.67 MB)
July 2007 (376 KB)
April 2007 (853 KB)
January 2007 (2.78 MB)
September 2006 (1.05 MB)
March 2006 (2.27 MB)

Maps
Area of initial investigations (2006) (496 KB)
Long list of route options (1.1 MB)

Constraint Maps

Gerringong constraint maps

Berry constraint maps


Advertisements
None Current

Previous workshops
Workshop presentation (May 2006) (1.02 MB)
Workshop meeting notes (May 2006) (118 KB)
Community Information Session presentation (February 2007) (1.24 MB)
Community Information Session meeting notes (February 2007) (221 KB)
Interest Group Workshop meeting notes (April 07) (42 KB)
Specialist Information Session (August 2007) (7.87 MB)

Fact sheets
Environmental Assessment Part 3A (822KB)
Quantm Study (592 KB)
1991 Gerringong to Berry Route Study (205 KB)
1996 Berry Bypass Study (209 KB)
Meeting environmental needs (267 KB)
How is noise addressed? (96 KB)
RTA access to private property for investigation of road projects (1.08 MB)
Your property and RTA projects (424 KB)

Community information requests
Meeting Notes March 2009 (84KB)

Reports

Toolijooa Ridge Preferred Option Report
Toolijooa Ridge Preferred Option Report June 2009 (2.15MB)

Gerringong and Berry Preferred Access Arrangements Report
Gerringong and Berry Preferred Access Arrangements Report (1.77MB)

Access Options Submissions Summary Report
Access Options Submissions Summary Report June 2009 (2.39MB)

Sustainability Factors, Climate Change and Economic Appraisal Report
Sustainability Factors, Climate Change and Economic Appraisal Report March 2009 (4.13 MB)

Gerringong and Berry Access Options
Access Value Management Workshop Report February 2009 (1.7 MB)

Preferred Option Report
Preferred Option Report October 2008 (12.51MB)

Fog Monitoring Report
Fog Monitoring Report September 2008 (726KB)

Route Options Submissions Report
Route Options Submissions Report (September 2008) (2.5 MB)

Route Options Value Management Study
Background paper May 2008 (7.1MB)

Value management workshop report May 2008 (580KB)

Route Options Development Report
Table of contents and Executive summary (644 KB)
Chapter 1 - Introduction (400 KB)
Chapter 2 - Strategic context (2.23 MB))
Chapter 3 - Community and stakeholder involvement (3.27 MB)
Chapter 4 - Statutory and strategic planning (1.18 MB)
Chapter 5 - The existing environment (12.0 MB)
Chapter 6 - Design considerations (49 KB)
Chapter 7 - Development of route options (1.18 MB)
Chapter 8 - Description of short listed route options (1.52 MB)
Chapter 9 - Project cost, economic analysis and safety (67 KB)
Chapter 10 - Summary of next steps (14 KB)
- Appendix A - Route Options Workshop Findings (1.91 MB)
- Appendix B - Preliminary Geotechnical Report (Part A) (10.8 MB)
- Appendix B - Engineering Logs and Core Photographs For Geotechnical Boreholes Part A (12.5 MB)
- Appendix B - Engineering Logs and Core Photographs For Geotechnical Boreholes Part B (19.1 MB)
- Appendix B - Engineering Logs and Core Photographs For Geotechnical Boreholes Part C (14.0 MB)
- Appendix B - Engineering Logs for Test Pits (14.2 MB)
- Appendix B - Electric Piezocone Plots and Pore Pressure Dissipation Tests Part A (10.5 MB)
- Appendix B - Electric Piezocone Plots and Pore Pressure Dissipation Tests Part B (13.5 MB)
- Appendix B - Geological Mapping Results (3.79 MB)
- Appendix B - Geotechnical Laboratory Test Results Part A (8.77 MB)
- Appendix B - Geotechnical Laboratory Test Results Part B (13.8 MB)
- Appendix B - Point Load Test Results (169 KB)
- Appendix B - Previous Relevant Borehole Logs Part A (15.1 MB)
- Appendix B - Previous Relevant Borehole Logs Part B (7.43 MB)
- Appendix B - Preliminary Geotechnical Report (Part B) (15.2 MB)
- Appendix B - Preliminary Geotechnical Report (Part C) (5.88 MB)
- Appendix C - Preliminary Urban and Regional Design Strategy Part A (15.4 MB)
- Appendix C - Preliminary Urban and Regional Design Strategy Part B (2.38 MB)
- Appendix D - Preliminary Traffic Assessment Report (3.75 MB)
- Appendix E - Preliminary Public Utilities and Services Report (1.97 MB)
- Appendix F - Preliminary Social Economic Impacts Report (1.60 MB)
- Appendix G - Preliminary Biological Report (Terrestrial Flora and Fauna) Part A(6.32 MB)
- Appendix G - Preliminary Biological Report (Terrestrial Flora and Fauna) Part B (8.88 MB)
- Appendix G - Preliminary Biological Report (Terrestrial Flora and Fauna) Part B (4.20 MB)
- Appendix H - Preliminary Biological Report (Aquatic Ecology and Water Quality Management) (4.42 MB)
- Appendix I - Preliminary Indigenous and Non-Indigenous Heritage Assessment Part A (3 MB)
- Appendix I - Preliminary Indigenous and Non-Indigenous Heritage Assessment Part B (8.99 MB)
- Appendix I - Preliminary Indigenous and Non-Indigenous Heritage Assessment Part C (5.01 MB)
- Appendix J - Preliminary Air Quality Management Report (7.23 MB)
- Appendix K - Preliminary Flooding and Drainage Report Part A (1.11 MB)
- Appendix K - Preliminary Flooding and Drainage Report Part B (6.31 MB)
- Appendix L - Preliminary Planning and Zoning Issues Report (1.98 MB)
- Appendix M - Preliminary Land Use Issues Report Part A (2.0 MB)
- Appendix M - Preliminary Land Use Issues Report Part B (2.62 MB)
- Appendix M - Preliminary Land Use Issues Report Part C (524 KB)
- Appendix M - Preliminary Land Use Issues Report Part D (317 KB)
- Appendix M - Preliminary Land Use Issues Report Part E (921 KB)
- Appendix M - Preliminary Land Use Issues Report Part F (1.07 MB)
- Appendix N - Preliminary Traffic Noise and Vibration Assessment Report (2.80 MB)
- Appendix O - Preliminary Property Impacts Report (4.99 MB)
- Appendix P - Preliminary Climatic Assessment Report (1.50 MB)
- Appendix Q - Preliminary Cumulative Effects Report (961 KB)
- Appendix R - Road Safety Audit - Stage 1, Route Options - Preliminary Concept Design (2.17 MB)

Community Consultation Report
Community consultation report (2006) (81 KB)
- Attachment A community update (March 2006) (2.26 MB)
- Attachment B information display advertisement (38 KB)
- Attachment B community workshop advertisement (34 KB)
- Attachment C sample feedback form (53 KB)
- Attachment D workshop presentation (1.02 MB)
- Attachment E community workshop meeting notes May 2006 (122 KB)
- Attachment F media clippings (February 2006) (918 KB)
- Attachment F media clippings (March 2006) (2.9 MB)
- Attachment F media clippings (April 2006) (1.56 MB)
- Attachment F media clippings (May 2006) a (2.41 MB)
- Attachment F media clippings (May 2006) b (2.38 MB)
- Attachment F media clippings (June 2006) (501 KB)
- Attachment F media clippings (July 2006) (709 KB)
- Attachment G media releases 1 (73 KB)
- Attachment G media releases 2 (15 KB)

Back to top

Terms of Use | Online Privacy Policy | Disclaimer